## attendees
|
|
- online
|
|
- puck
|
|
- llama
|
|
- offline
|
|
- lp
|
|
|
|
## items
|
|
|
|
### flooring update
|
|
- lippy been smearing cement
|
|
- question: do we collapse the mushroomtent and move the flatfiles there
|
|
- asking joe about whether we need the mushroom tent or not
|
|
- if we move the flatfiles and paint the ceiling we can have the first corner of nice space
|
|
- "i don't understand anyone think it's okay to continue to use this current active space." - a lot of things could be destroyed
|
|
- if anyone disagrees im all ears -- lippy
|
|
|
|
### space purge take 2
|
|
- some enders are going out saturday
|
|
- tv is gone
|
|
- cannot give out photography equip
|
|
- thursday nights are out recycle / trash night
|
|
- we should get rid of those equips
|
|
|
|
### coffee roasting
|
|
- there's an interest in forming a coffee roasting collective
|
|
- the person who owns some expensive gears agree for us to use their equipments to roast coffee
|
|
- need to figure out ventilation
|
|
- theoretically 250 ft^3 / hour capacity right now
|
|
- need to figure out electricity
|
|
- we can try on saturday
|
|
- there is a tent for ventilation
|
|
- but need to figure out how to connect to the fan
|
|
|
|
### ooza?
|
|
- next step
|
|
- last week we tried watercolor (too much pressure we may have fucked it up)
|
|
- lippy ordered more of those pens
|
|
- acrylic medium, liquid latex (puts out ammonium fume)
|
|
- need masks or leave the space
|
|
- let's try acrylic medium first
|
|
- check with will with recipes
|
|
- come up with our own ooze
|
|
- saw dust?
|
|
|
|
### axidraw?
|
|
- micro's shit we will have to wait for an update
|
|
|
|
### electrical
|
|
- jimmy's electrician, he can take a look at the situation on saturday
|
|
- llama will ask jimmy to bring some gears
|
|
- maybe hope for a electrical mapping of the building and the basement
|
|
- want a general assesment whether we can build a breaker panel off of the main
|
|
- self interested in we are separated and we have rated circuit and we know how to load them
|
|
- hope: we have breakers instead of fuses
|
|
|
|
### air filtering
|
|
- we need to build more air filter
|
|
- it says 100% but i dont fucking trust it it's so fucking clogged
|
|
- generally need to build more rosenthal boxes.
|
|
- we need more air filtering
|
|
- woodworking produces a lot of find dust can we look into qurantine this area
|
|
- we have some curtains
|
|
- need more brainstorming
|
|
- brainstorming...
|
|
- dust collecter are just a powerful fan with filter, can we do a corsi rosenthai device hooked directly to the dust collector
|
|
- are the air being filtered the problem?
|
|
- this needs more brainstoring...
|
|
|
|
### air intake
|
|
- jesse cut some panel of wood to cover the weird hole towards the sidewalk
|
|
- we can pull some air with the fan
|
|
- the fan is very powerful, don't know how to lower the speed
|
|
- need to regulate the speed?
|
|
- for now we can just run a bit and turn it off
|
|
- lippy will figure out how to get parts this week
|
|
|
|
|