You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
56 lines
1.1 KiB
56 lines
1.1 KiB
## meeting 59
|
|
|
|
### human
|
|
- llama
|
|
- lp
|
|
- puck
|
|
- flora (remote)
|
|
|
|
### agenda
|
|
- old vent, new vent
|
|
- pipe insulation
|
|
- garnet is fixed
|
|
- holiday market
|
|
- signal admin
|
|
|
|
### notes
|
|
|
|
#### old vent, new vent
|
|
|
|
Old Vent (fresh air vent from near the stairs)
|
|
|
|
* removed by the landlord
|
|
|
|
New Vent (from the back up to the roof)
|
|
|
|
* want to uncap the the vent on the roof, cut a hole, use the motor / fan
|
|
|
|
In General
|
|
|
|
* post-inspection we should get a warm intro to Dino
|
|
|
|
#### pipe insulation
|
|
|
|
* need to order pipe insulation, could not find at home depot
|
|
* LP is skeptical of the efficacy of covering the pipes but llama says it will work
|
|
|
|
#### garnet is fixed
|
|
|
|
The People Cheer, GO NUTS!
|
|
|
|
Takeaways
|
|
|
|
1. equipment should maybe classified by risk of messing it up
|
|
2. need robust backups
|
|
|
|
#### holiday market
|
|
|
|
* we were granted a small corner at the holiday market to sell coffee
|
|
* need to host under the woodbine brand
|
|
|
|
#### signal admin
|
|
|
|
* right now only llama can approve people to signal
|
|
* want to open it to everyone but then everyone can kick
|
|
* don't want to have class divide
|
|
* alternative option: remove admin approval |