You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.

2.8 KiB

Meeting 64

Attendees

Local - llama jason lp puck Remote - cel flora micro

What are you up to? (60s)

Agenda

Announcements (No discussion. Post-meeting breakout possible)

  • new lighting!
  • new coffee machine!
  • puck going to resistor craft night

Inside business

new years party recap

  • jason had a lot of fun
    • met someone in the bathroom line and made friends
    • invited them to the basement chat
    • lippy chatted with them
    • person interested in contributing
  • lp had a weird night
  • cel: woodbine raised 3400

Sewing station (~LP)

(request from Vanessa/Maricella)

  • got a request from maricela via vanessa to set up a sewing station
  • possible to set up a sewing station for everyone to use
  • they have sewing station in resistor as well
  • flora: knows how to sew and be happy to help out
  • space: how much space do we need?
    • small, but
    • need space to layout fabric
    • need lighting etc.
    • why don't we make a table multipurpose
  • there are five sewing machines and fabrics currently in the basement
  • we need more flat surfaces
  • friend of beas wants to take ownership of serger
    • serger is a type of sewing machine primarily used in finishing
    • lp: borrowing is great, check runnability, learn the piece of equippment
    • bea found on the street and gave it to the space
    • jason: if there's a semipermanent sewing operation here: is it worth to keep it here
    • flora: we dont know if serger works, could it be looked at by someone who knows?
  • who can bottomline sewing operation?
    • flora was not forced to be happy to be elected
  • we can loan them out for 3-4 month

Layout review (~LP)

https://basement.woodbine.nyc/basement_layout_proposals#

  • too much to report. but look at the above link for more info
  • woodshop is staying
  • 4x8 wood storage needs to be moved to a different place to expose leaky wall
  • first steps:
    • painting floor, move soldering station

Final paint selection plz (~LP)

https://basement.woodbine.nyc/color-chip-sets

  • a couple of samples, leave on the samples
  • those of you who are not here should come look

#### Printer bench tenting (~LP) Tent options

mushroom distro event next Saturday 12th

  • significant number of people come by, 900 likes on instagram
  • from 3-6 PM distribution of blocks from small hold
mushroom tent
  • now a roach motel but tent is now empty
  • ella bought a new fan for the tent

FOIL request flipper zero

  • NYPD with Flipper Zero rejected due to unconventional ideas
  • Workshop?
    • Can only accomodate ~4 people down here, antenna was 6-7 and felt the maximum